Drawing of a group of people gathered together

Department of Public Safety Officers, designated staff members will direct occupants to building assembly area away from the building and conduct an assessment to account for building occupants.

Largo Campus

Largo Campus
Assembly Areas
Accokeek Hall Lot H - During Marlboro construction
Annex A Lot N
Annex B Lot N
Annex C Lot N
Bladen Hall Lot E – During Marlboro construction
Center for Advanced Technologies Lot H
Center for Health Studies Lot G
Center for Performing Arts Lots E, F, & H
Chesapeake Hall Lot C
Continuing Education Building Lot E
Culinary Arts Center Lot A
Facilities Management Lot P
Campus Police Lot P
Kent Hall Lot H
Lanham Hall Lot C
CMD Student Center Lot C
Marlboro Hall OFFLINE/CONSTRUCTION Lot C after construction
Bickford Natatorium Lot G
Novak Field House Lot G
Steel Building (Ceramics) Lot G
Warehouse Lot P

 

Skilled Trade Center Campus

Skilled Trade Center Campus
Assembly Areas
STC Building Front & Rear Parking Lots

Students and staff should gather across the street in the mall parking lot.

Westphalia Skilled Trade Center Campus

Westphalia Skilled Trade Center Campus
Assembly Areas
Westphalia Building Front & Rear Parking Lots

Laurel College Center Campus

Laurel College Center Campus
Assembly Areas
LCC Building

Front & Side Parking Lots

Outside assembly is in parking lot across the street from the main entrance on Marshall Street. Assemble by back fence in lot.

University Town Center Campus

University Town Center Campus
Assembly Areas
UTC Building

Liberty Lane Lot & Courtyard Garage-B

Assemble in the courtyard.

Joint Base Andrews Campus

Joint Base Andrews Campus
Assembly Areas
JBA Building

Congregate in Building 1413, room 221 (shelter-in-place area).

Fire - all occupants leave building and assemble at the foot-ball/ soccer field outside the building proximate to the parking lot directly across from the Education building.