Department of Public Safety Officers, designated staff members will direct occupants to building assembly area away from the building and conduct an assessment to account for building occupants. |
Largo Campus
Largo Campus |
Assembly Areas |
Accokeek Hall | Lot H - During Marlboro construction |
Annex A | Lot N |
Annex B | Lot N |
Annex C | Lot N |
Bladen Hall | Lot E – During Marlboro construction |
Center for Advanced Technologies | Lot H |
Center for Health Studies | Lot G |
Center for Performing Arts | Lots E, F, & H |
Chesapeake Hall | Lot C |
Continuing Education Building | Lot E |
Culinary Arts Center | Lot A |
Facilities Management | Lot P |
Campus Police | Lot P |
Kent Hall | Lot H |
Lanham Hall | Lot C |
CMD Student Center | Lot C |
Marlboro Hall OFFLINE/CONSTRUCTION | Lot C after construction |
Bickford Natatorium | Lot G |
Novak Field House | Lot G |
Steel Building (Ceramics) | Lot G |
Warehouse | Lot P |
Skilled Trade Center Campus
Skilled Trade Center Campus |
Assembly Areas |
STC Building | Front & Rear Parking Lots Students and staff should gather across the street in the mall parking lot. |
Westphalia Skilled Trade Center Campus
Westphalia Skilled Trade Center Campus |
Assembly Areas |
Westphalia Building | Front & Rear Parking Lots |
Laurel College Center Campus
Laurel College Center Campus |
Assembly Areas |
LCC Building |
Front & Side Parking Lots Outside assembly is in parking lot across the street from the main entrance on Marshall Street. Assemble by back fence in lot. |
University Town Center Campus
University Town Center Campus |
Assembly Areas |
UTC Building |
Liberty Lane Lot & Courtyard Garage-B Assemble in the courtyard. |
Joint Base Andrews Campus
Joint Base Andrews Campus |
Assembly Areas |
JBA Building |
Congregate in Building 1413, room 221 (shelter-in-place area). Fire - all occupants leave building and assemble at the foot-ball/ soccer field outside the building proximate to the parking lot directly across from the Education building. |